Seats
A proposed 7 voting members, elected by and from the active maintainer community across all pillars. Odd-numbered to avoid ties.
The Technical Steering Committee (TSC) is the technical heart of the TOSSI Foundation. It owns the technical direction of the entire open telecom stack TOSSI integrates - and nothing else. The TSC does not control the budget, marketing, or trademark; those belong to the Governing Board. This separation keeps technical decisions free of commercial pressure.
The model follows a proven technical-oversight pattern from mature open-source foundations: a small, elected, merit-based body that stewards projects through a transparent lifecycle.
Seats
A proposed 7 voting members, elected by and from the active maintainer community across all pillars. Odd-numbered to avoid ties.
Terms
Staggered two-year terms, with roughly half the seats up for election each year to preserve continuity.
Neutrality cap
No more than ~40% (at most 2 of 7) of seats may be held by individuals from any single employer. If an election would breach the cap, the next-eligible candidate is seated.
Chair
A Chair (and Vice-Chair) elected by the TSC from among its members. The Chair runs meetings and represents the TSC to the Governing Board as a non-voting liaison; the Chair does not hold a tie-breaking vote.
Seats are held by individuals, not companies. Members serve in their personal capacity, on the strength of their technical contribution and judgment. Eligibility to vote and stand is tied to demonstrated, sustained contribution (the active-maintainer roll), not to membership tier or company sponsorship.
The TSC is accountable for the coherence, quality, and neutrality of the integrated stack.
Technical direction
Sets cross-cutting architecture, the integration strategy across pillars, and the foundation’s technical priorities and roadmap horizons.
Project lifecycle
Accepts new projects into the sandbox, promotes projects through incubation to graduation, and archives projects that are no longer viable.
Conformance & interop policy
Owns what “validated” means: the conformance criteria, interoperability test policy, and how results are published - vendor-agnostically.
Cross-project arbitration
Resolves disputes that span more than one project or pillar, where no single maintainer group has authority.
Standards alignment
Maintains liaison with 3GPP, the O-RAN ALLIANCE, the IETF, and ETSI so integration tracks the real specifications.
Delegation & SIGs
Charters Special Interest Groups and working groups, and delegates day-to-day authority to maintainers - keeping decisions at the lowest competent level.
The TSC deliberately delegates as much as possible. Routine, project-local decisions belong to maintainers; the TSC handles only what genuinely spans the foundation.
Every TOSSI project moves through three maturity stages on a sandbox → incubating → graduated ladder. The stage signals maturity and adoption risk to users, not the project’s worth.
Sandbox experimental
The entry point for early or experimental work. Low bar, low commitment, clear signal to users that the project is young.
Incubating adoption growing
Projects with demonstrated traction and a healthy contributor base.
Graduated production-grade
The mark of a mature, neutrally governed, production-grade project.
The TSC works the same way the rest of the foundation does - in the open, by consensus first, by vote only when it must.
Lazy consensus is the default. Most decisions are made on public issues, pull requests, or TOSSI Enhancement Proposals (TEPs). If no member with standing objects within the review window, the decision carries. Silence is assent.
Discussion is public. TSC meetings have public agendas and minutes; recordings are posted. Anyone may attend and observe; the floor is open during community segments.
Voting is the backstop. When consensus fails, the TSC votes. Routine matters pass by simple majority; high-impact matters - graduation, charter amendments, lifecycle policy changes - require a two-thirds supermajority.
Quorum. A vote requires two-thirds of voting members present (or voting asynchronously) to be valid.
The record is the source of truth. Every formal decision, its rationale, and the vote tally are published. If it isn’t in the public record, it didn’t happen.
| Decision | Mechanism |
|---|---|
| Routine cross-project change, SIG charter | Lazy consensus |
| Accept a project into sandbox | Sponsor + simple-majority confirmation |
| Promote a project to incubating | Simple majority |
| Promote a project to graduated | Two-thirds supermajority |
| Archive a project | Simple majority |
| Amend lifecycle or conformance policy | Two-thirds supermajority |
| Amend the charter (technical portions) | Two-thirds supermajority |